❌

Lese-Ansicht

Japan verschärft Kampf gegen weltweite Manga- und Anime-Piraterie

Computer, Piraterie, Tastatur, Maus, Japan, Bildbearbeitung, Comic, Scanner, Anime, Herunterladen, One Piece, Manga, Digitalkunst, Grafiksoftware, Download-Fortschritt, Manga-Zeichnen, Strohhut-Piraten, Manga-Sammlung, digitales Zeichnen Die japanische Behörde für kulturelle Angelegenheiten setzt im Kampf gegen die Piraterie von Anime und Manga auf künstliche Intelligenz. Nach erfolgreichen Tests im Inland durchsucht ein autonomer KI-Agent nun auch ausländische Webseiten. (Weiter lesen)
  •  

China’s AI hardware push is moving beyond GPUs to the PCBs underneath them — Beijing races to corner the market on copper foil and micro-drill bits as board complexity explodes

Much of the attention on China's AI hardware industry has been focused on the country’s drive to develop domestic GPUs, including Huawei's Ascend processors, as U.S. export restrictions make it harder to buy advanced chips in the region. But making an AI server involves far more than securing its processors. The printed circuit boards (PCBs) connecting chips, memory, and networking equipment are becoming harder to manufacture, and Chinese companies are racing to supply the materials and equipment they require.

More than 20 Chinese PCB manufacturers announced major expansion plans in the first half of 2026. Three recent reports from HSBC and J.P. Morgan suggest the shortages could extend to products as unglamorous as drill bits and copper foil. Having a plentiful and regular supply of those components in the manufacturing process is important because the tiny drill bit used to make the circuit boards inside AI servers could be worn out after drilling fewer than 200 holes, according to HSBC, compared with around 2,000 holes for older materials.

It’s all part of a manufacturing process which stresses every part of the supply and manufacturing chain, beyond obvious components.

More holes, fewer uses

PCBs are built by layering copper and insulating material together, then drilling holes through them to connect their circuits. But the complexity of those boards is increasing as AI servers are designed to handle more data, including more layers than those seen in ordinary computers. HSBC estimates that a notebook PCB has four to eight layers, compared with more than 20 for Nvidia's H100 generation of GPUs.

But that’s just the beginning of the process. Analysts at the bank forecast that a backplane in Nvidia’s Rubin Ultra systems could contain 78 layers. Nor is the Rubin Ultra an outlier in that process: the bank also forecasts a 36% annual rise in the number of holes required per board between 2025 and 2028. The holes themselves are becoming more challenging to drill. According to a report by Taiwanese brokerage KGI Securities, the ratio between the depth of the hole and its diameter has increased from around 20:1 to 30:1 or 40:1. That requires pushing an extremely thin drill bit deeper into increasingly tough materials without bending or breaking it, or damaging the delicate circuitry, which can easily happen in such a sophisticated manufacturing process.

As well as the number of layers which have to be drilled through increasing in number, the materials involved are also adding complexity to the equation. New grades of copper-clad laminate — the glass-fibre-and-resin material onto which copper is bonded — are becoming trickier for the tiny tungsten-carbide tools previously used in the process to cut. “AI PCBs are denser with thicker layers, requiring more holes drilled per PCB,” writes Helen Fang, head of Asia Pacific industrials research at HSBC. The increasingly common use of harder laminates is resulting in the bits being consumed more quickly.

That’s good news for those making drill bits: HSBC forecasts global demand growing 55% a year in the coming three years. And as with many parts of the AI revolution, the voracious appetite of the sector means that supplies can’t keep up. Even with manufacturers increasing production, the bank forecasts a 24% supply shortfall in PCB drill bits in 2027.

That could push the world towards Chinese suppliers, right as the west is trying to wean itself off a dependency on the country for rare earths and other elements necessary to make GPUs. Guangdong Dtech, based in China, is the world’s largest PCB drill bit maker by volume. Around three in every 10 drill bits made in 2025 come from the company, with its monthly capacity potentially climbing from 160 million bits in June to more than 235 million by year-end. Japanese and Taiwanese manufacturers are still dominant at the premium end of the market, according to consultancy Frost & Sullivan, though Chinese manufacturers are trying to close that gap.

In its 2026 interim results, Dtech reported that it had begun mass-producing drill bits with aspect ratios exceeding 40:1, while developing techniques for producing bits exceeding 60:1. Its newer diamond-coated tools for particularly tough M9+ board materials have also entered small-scale use.

China calling

It’s not just in drill bits that China has a chokehold. Another Chinese manufacturer, Defu Technology, has historically been a key supplier of copper foil for lithium-ion batteries, but is increasingly changing its manufacturing processes to try and capitalise on the AI boom. “AI server PCB/CCL upgrades require smoother HVLP copper foil to reduce high-speed signal loss,” writes Avery Chan, a JP Morgan analyst.

HVLP stands for hyper-very-low-profile copper foil, and its manufacturers must make the surface smooth enough to minimise signal loss while making sure it can still stick to the insulating material it is attached to.

The business has historically been dominated by suppliers outside mainland China, with Japan’s Mitsui Kinzoku and Furukawa Electric, and Taiwan’s Co-Tech, holding more than 60% of global HVLP supply in 2025. Defu is trying to break in to disrupt that, with the firm shipping around 700 tonnes of HVLP foil in September, including more than 180 tonnes of HVLP4. JP Morgan’s Chan forecasts a shortage of qualified HVLP4 supply of around 700 tonnes a month in 2026, rising to 1,200 tonnes in 2027. Defu plans to add 50,000 tonnes of annual high-end PCB foil capacity over 2027 and 2028. But all the foil it creates will have to get past stringent testing.

Testing chips

Even before finished chips reach a server, they must be tested using specialist probe cards and sockets, which themselves rely on sophisticated PCBs of a type not found in a server but just used to check whether the chips work. “PCB is becoming the bottleneck and the value-add in probe cards,” wrote JP Morgan analyst Jerry Tsai.

Because of that, China is focusing attention there, too. In September, its Ministry of Industry and Information Technology and National Development and Reform Commission published a five-year plan calling for advances in high-frequency, high-speed and densely layered PCBs, alongside copper-clad laminates, low-profile copper foil and specialist manufacturing equipment.

But China won’t see the benefits of building new factories immediately. Producing the most sophisticated PCBs requires experience, specialist equipment and the ability to manufacture complex designs consistently at scale. Tsai warned that “the learning curve is measured in years, rather than quarters.”

  •  

RingConn Gen 3: Smart Ring erscheint als Herr-der-Ringe-Edition

Wearables, Fitness-Tracker, Warner Bros., Gesundheit, Der Herr der Ringe, Smart Ring, RingConn, The One Ring Aus Mittelerde an den Finger: RingConn verwandelt seinen aktuellen Smart Ring Gen 3 in eine limitierte Sonderedition im Design von Der Herr der Ringe. Für 419 Euro bietet das Sammlerstück neben der Filmgravur umfangreiche Gesundheitsfunktionen. (Weiter lesen)
  •  

TSMC gives a sneap peak at AI Design Kit: Agentic AI with foundry expertise

The semiconductor industry is in a paradoxical situation these days. On the one hand, AI drives demand for the leading-edge nodes from both established players and new entrants, with everyone trying to accelerate the development cycle. On the other hand, leading-edge nodes become more complex, which increases entry barriers and stretches design cycles. While the challenge seems to be insoluble, it looks like TSMC has found a solution.

TSMC

(Image credit: TSMC)

At its 2026 Europe OIP Ecosystem Workshop in Munich, TSMC this week unveiled its AI Design Kit (ADK), a collection of process-specific technical information, implementation guidelines, and design methodologies that enables AI agents to automate and optimize chip development flows.

The ADK complements the foundry's traditional process design kits (PDKs) and enables AI agents to use TSMC's process-specific expertise, knowledge of electronic design automation (EDA) tools, and customers' proprietary design methodologies to automate physical implementation and optimization of chips. Ultimately, the initiative aims to reduce development cycles, improve design productivity, and simplify adoption of TSMC's advanced process technologies.

"The ADK complements our traditional PDK, and it brings in capabilities to augment the EDA and other design flows," said Aveek Sarkar, Head of Ecosystem and Alliance Management at TSMC. "Our goal with these agentic flows is to bring in the technology-specific learning we have at TSMC and layer that with your orchestration layer, with your design expertise, and to support the next generation of EDA or design flows and methodologies that you have."

Why AI?

While every new fabrication process from TSMC offers advantages in terms of power, performance, and area (PPA), it also considerably increases design complexity. Compared to TSMC's N5-derived manufacturing technologies (including various N4 nodes), the number of design rules has increased by 2.3X with N3P, 3.1X with N2P, and 3.6X with A14 (the first node to be supported by the ADK).

Meanwhile, the number of available standard library cells has increased by 2.8X, 5X, and 4.6X, respectively. Add to that a greater number of metallization stack options and plenty of EDA tool settings, and the number of possible design configurations becomes massive. As a result, conventional design optimization methodologies approach their productivity limits, according to TSMC. At the same time, some of TSMC's customers want to reduce their chip development cycles from 18 months to 12 months, Sarkar said.

Technology

N5/N4P

N3P

N2P NanoFlex

A14 NanoFlex Pro

Library

HD, HP

HD, HP, UHP

HD, HP, UHP + Boost Cells

HD, HP + Boost Cells

Cell Count

1.0x

2.8x

5.0x

4.6x

Rule Count

1.0x

2.3x

3.1x

3.6x

Usage of agentic AI could help chip developers to explore more design configurations within shorter timeframes, achieve more favorable PPA results from advanced process technologies, and potentially improve manufacturability and yields by implementing more extensive physical design optimization. Furthermore, it could reduce the amount of engineering work required to adopt a new fabrication process for a new design.

"AI is bringing a significant benefit: faster design cycles, more verification coverage, faster time to closure," Sarkar said.

Do physical implementation faster

TSMC's early-phase AI Design Kit incorporates process-specific information, such as metal pitches, standard cell heights, routing track patterns, library cell naming conventions, and implementation guidelines, according to slides demonstrated at the event.

TSMC

(Image credit: TSMC)

With the ADK, EDA agents — such as Cadence's InnoStack or Synopsys's Implementation Agent — can use a simple natural-language prompt and a large language model (LLM) to automatically generate a qualified automatic placement and routing (APR) reference flow for TSMC's A14 process technology. Such a flow includes project setup, library cell usage, placement and routing optimization, routing track and power grid creation, and wide-wire configuration. Traditionally, engineers could spend weeks on preparation of such scripts, but now APR scripts could be prepped with a natural language prompt, though TSMC did not disclose the actual time it takes to prep them (probably because it depends on design complexity and goals).

"Instead of spending weeks preparing APR scripts, EDA agents can take a simple prompt from users and the TSMC ADK and use a generative model to deliver a qualified APR reference flow," a spokesperson from TSMC said at the stage.

For more sophisticated design tasks, TSMC proposes an orchestration agent that resides at the customer's site and combines three sources of knowledge with clear ownership:

  • Proprietary in-house design know-how, constraints, guidelines, and customized flow;
  • Specialized EDA agents that know how to use EDA tools and their capabilities;
  • TSMC's ADK that provides design reference package and technology-specific information on top of what EDA agent and tools know.

The orchestrator coordinates agents responsible for design diagnostics, power grid implementation, timing closure, design rule checks, and congestion mitigation. These agents analyze EDA tool output and automatically adjust parameters for subsequent iterations across floorplanning, placement, clock tree synthesis, routing, sign-off, and engineering change orders (ECOs). Such a methodology enables continuous design optimization 24/7 with less human intervention.

"The orchestrator then directs these agents to analyze the output of EDA tools and automatically adjust the settings for the next iteration across floorplan, placement, CTS, routing, sign-off, and ECO," the spokesman said. "This agentic AI flow drives the iterative design process 24/7, minimizing the turnaround time and maximizing productivity."

Complement, not replace

For now, TSMC's ADK primarily addresses physical implementation rather than chip architecture or logic design. The company has not demonstrated an autonomous design flow that takes a chip from an architectural specification to tape-out without human intervention. Nor has TSMC disclosed quantified PPA improvements, actual reductions in development cycles, or a commercial availability timeframe for its ADK.

It is noteworthy that TSMC's ADK neither replaces conventional PDKs nor substitutes for advanced AI-enabled EDA software from Cadence, Synopsys, Siemens EDA, or other developers. Instead, it provides process-specific knowledge that enables AI agents to make more informed decisions, while the actual physical implementation, simulation, optimization, and verification tasks remain the domain of specialized EDA tools. Thus, chip developers cannot use the ADK independently of traditional EDA infrastructure.

Strategic importance

For TSMC, the ADK could accelerate adoption of its latest fabrication processes, as customers could adapt their design methodologies to new nodes faster. Smaller fabless chip developers could also gain access to sophisticated physical design methodologies without the need to develop expertise comparable to that of prominent chip developers entirely in-house. Meanwhile, EDA and IP providers could benefit from closer integration of their products into process-specific design flows, whereas contract chip designers could offer shorter development times for their customers without significant additional investments.

There is also a potential customer lock-in aspect. While TSMC's proposed architecture preserves customers' ownership of proprietary design knowledge, extensive integration of foundry-specific physical design enablement collateral, EDA agents, and internal orchestration systems could make migration to another foundry harder and generally less likely as chipmakers get more accustomed to TSMC ADK (which is an exclusive capability for now and will remain an exclusive offering for a while). In effect, TSMC's competitive advantages will extend well beyond its process technologies, production capabilities, and conventional design ecosystem to include intelligence that emphasizes its customers' chip development methodologies.

  •  

TU Berlin: Forscher knacken Windows Hello PIN-Schutz per Brute-Force

Windows, Windows 10, Sicherheit, Windows 11, Hacker, Security, Lücke, Login, Windows hello, Login Screen, Traurig Forscher der Technischen Universität Berlin haben eine Methode entwickelt, mit der sich die PIN-Eingabe unter Windows per Brute-Force-Attacke umgehen lässt. Das Team schaltet dabei einen Chip zwischen, der Schutzfunktionen des TPM umgeht. (Weiter lesen)
  •  

TSMC's A14 1.4nm-class node is ready for chip design

TSMC announced at its 2026 Europe OIP Ecosystem Workshop this week that its A14 (1.4nm-class) fabrication technology is ready for customer design work and version 0.9 of its process design kit (PDK) is ready. TSMC also detailed Boost Cells, a way for the new node to deliver 14% higher performance compared to N2P, and how customers can migrate their designs to A13 in the future. Furthermore, Cadence and Synopsys have both completed full design-flow certification on an Arm Cortex-A725 CPU core, which gives chip designers two validated toolchains to build their 14A chips.

"A14 0.9 design ecosystem and the PDK are ready for design in," a TSMC spokesman said on stage at the 2026 Europe OIP Ecosystem Workshop.

Boost Cells and Low-Power Cells provide further improvements

A14 uses TSMC's 2nd Generation nanosheet transistors and its NanoFlex Pro standard cell architecture, which supports Boost Cells to enable higher performance as well as Low-Power Cells to reduce power consumption. Designers can place compact high-speed Boost Cells on critical paths (which resembles Intel's Turbo Cells supported by its 14A fabrication technology) and use Low-Power Cells with narrower nanosheets for general logic or parts of the chip that do not need high performance.

In general, TSMC promises A14 with NanoFlex Pro optimizations to deliver a 14% speed gain at the same power or a 23% reduction in total power at the same speed compared to N2P with NanoFlex. In a separate comparison against baseline N2P, TSMC put A14 at 50% higher energy efficiency, 22% higher drawn transistor density, and 23% higher logic density.

TSMC process comparison against baseline N2P

Metric

N2P

N2P NanoFlex

N2U NanoFlex Pro

A14 NanoFlex Pro

A13 NanoFlex Pro

Energy efficiency

Baseline

+12%

+23%

+50%

+58%

Transistor density (drawn)

Baseline

+11%

+16%

+22%

+22%

Logic density (silicon)

Baseline

0%

+2%

+23%

+30%

A14 also gives customers a path to A13. The foundry says customers can cut die area by about 6% without changes to their A14 design flow. Furthermore, to take even more advantage of A13 and get 5% higher energy efficiency, all the designers have to do is re-engineer the M0 metal layer, reshape OD, and use VT Flex cells (cells that can use different threshold-voltage options for their NMOS and PMOS transistors).

TSMC expects to start risk production using A14 in the second half of 2027, with mass production following in the second half of 2028. Chief executive C.C. Wei said in October that the company had already seen more customer activity on A14 than on N2 at a comparable stage of development and expects A14 to become a bigger node than its 2nm-class predecessor. A13 is set to reach the high-volume manufacturing stage in the second half of 2029.

A14 PDK and ecosystem nearly ready

One of the key parts of the TSMC announcement is the readiness of the 0.9 version of the PDK and the electronic design automation (EDA) tools ecosystem. What matters about v0.9 is that the industry considers this revision ready for design work, which means that customers can start designing chips with confidence that they will meet their performance and power goals. Furthermore, TSMC has validated two complete flows — by Cadence and Synopsys for A14, with Siemens EDA's flow coming later.

"Today, both Cadence and Synopsys have successfully completed full design flow certification for the Cortex-A725," the spokesman said. "This program tests the full chain of implementation and sign-off EDA tools with TSMC foundation IP. We expect it to benefit the entire A14 design community. This table summarizes A14 v0.9 certification for our three major EDA partners, Cadence, Synopsys, and Siemens, across automatic placement and routing, library characterization, timing, power, EM/IR, and other sign-off flows. Siemens is targeting Q4 for transistor-level EM/IR certification. So the A14 v0.9 design ecosystem and the PDK are ready for design-in.

TSMC A14 v0.9 EDA ecosystem readiness

Capability

Cadence

Synopsys

Siemens EDA

Automatic placement and routing (APR)

Certified

Certified

—

Library characterization

Certified

Certified

—

Timing analysis

Certified

Certified

—

Power analysis

Certified

Certified

—

Electromigration and voltage-drop analysis (EMIR)

Certified

Certified

—

Design rule checks (DRC)

Certified

Certified

Certified

Dummy fill

Certified

Certified

Certified

Layout-versus-schematic checks and layout parasitic extraction (LVS/LPE)

Certified

Certified

Certified

Resistance and capacitance extraction (RC)

Certified

Certified

Certified

Custom design

Certified

Certified

—

Transistor-level EMIR

Certified

Certified

Work in progress

Transistor-level timing analysis

—

Certified

—

Simulators

Certified

Certified

Certified

Certified categories

12 of 13

13 of 13

5 of 13

As of October 1, Cadence, Synopsys, and Siemens EDA all had A14 v0.9-certified tools for design rule checks, dummy fill, layout-versus-schematic verification and layout parasitic extraction (LVS/LPE), resistance and capacitance extraction, and circuit simulation. Cadence and Synopsys also had certified tools for automatic placement and routing, library characterization, timing and power analysis, custom circuit design, and electromigration and voltage-drop (EM/IR) analysis at both the design and transistor levels.

Synopsys alone had certified transistor-level timing analysis, which gave it coverage across all 13 categories versus 12 for Cadence and five for Siemens EDA. Cadence and Synopsys also completed full-flow certification on an Arm Cortex-A725 design with TSMC foundation IP, from synthesis and physical implementation through electrical, physical, and thermal sign-off. Siemens EDA's transistor-level EM/IR certification is in progress and is due in Q4 2026.

  •  

TSMC’s $22.6 billion Texas plan wouldn’t make 2nm-or-better chips until 2031

TSMC has made an application for a new fab and campus near College Station, Brazos County, Texas. The proposed fab would be just one county over from Terafab, would likely share supply chains, and would be positioned to make 2nm-class chips by 2031, with the $22.6 billion plan detailing how the Taiwanese chipmaker is planning to expand its U.S. operations. An application under Texas’s Jobs, Energy, Technology and Innovation (JETI) program for a school property-tax limit shows TSMC is weighing a new fab site. The fab wouldn’t make 2nm or more advanced chips until 2031, six years after 2nm volume production began in Taiwan. It would come with a school-tax break valued at around $354 million.

This would be the company’s “second campus” for advanced chipmaking in the U.S. and the first outside Arizona. The Comptroller has recommended the tax application for approval, which the school district and the governor still have to grant. The application comes from TSMC Arizona Corporation, which is TSMC’s subsidiary located in Phoenix. Construction is projected to start in 2027, but the plan remains under evaluation, and nothing in the filing commits TSMC to buy the land or to build on it.

Map of the 3,232-acre site TSMC proposes southwest of College Station, Texas, outlined in red, with the city limits shaded blue and the Brazos River to the west.

(Image credit: Tom's Hardware)

TSMC is looking to build out more in the U.S. because most of its large customers are based there and the government has been “very helpful” in pursuing additional fab capacity, Chairman and CEO C.C. Wei said in October. Texas is one option for expanding beyond Arizona, though the filing doesn’t say what drew TSMC there. TSMC judges each site on its tax environment, workforce availability, utility capacity and cost, and site and infrastructure readiness, as well as its “long-term scalability and expansion potential.” TSMC says Arizona offers “established operational efficiencies and lower capital risk,” and that the tax incentive would aid this further.

TSMC has “nearly 20 fabs worldwide in progress,” Wei said on the October earnings call, including 13 leading-edge and advanced packaging fabs in Taiwan and “another five to six fabs overseas.” Annual capacity for its 2nm (N2) family is expected to more than double in 2027. TSMC also expects more of its fabs to be ramping up in the U.S.

Texas wouldn’t begin commercial operations until 2031, and the economic model filed with the plan doesn’t have it at full operations until 2032. By contrast, the second fab in Arizona is expected to begin volume production in Q3 2027, but at 3nm. In Taiwan, N2 has been in high-volume production since Q4 2025. TSMC expects A14, its next full node after N2, to enter risk production in 2027 and volume in 2028. By 2031, A14 is set to have been in volume production for about three years, so a Texas fab that starts on 2nm would be at least a generation behind TSMC’s leading edge. Taiwan has also debated limits on how advanced TSMC’s overseas fabs can be.

TSMC’s roadmap and the Texas timeline

Milestone

Where

When

2nm (N2) volume production

Taiwan

Q4 2025

A16 (a 2nm-family node) volume production

TSMC, site not stated

2027 (expected)

3nm volume production, second fab

Arizona

Q3 2027

A14 volume production

TSMC, site not stated

2028

High-NA EUV adoption

TSMC, site not stated

2030 (planned)

2nm “and/or more advanced,” commercial operations

Texas (proposed)

2031

The new site would have one or more fabs but, as it stands, Brazos County’s announcement describes one. For scale, we’ve estimated that a single 2nm-class module with about 20,000 wafer starts a month costs $25 billion to $35 billion, so this plan’s $22.6 billion budget falls below the low end of that range.

The price tag is split in multiple ways, with $8.60 billion for buildings and other real property, while 62% of the total, or $14.02 billion, is for tooling, machinery and equipment, a category that on the filing’s list also covers power, HVAC, cleanroom, water and gas systems. The building's spending would come first, in 2027, 2028, and 2029 alone. Tool spending would begin in that last year and peak at $9.05 billion in 2030, with about 65% of the tool budget landing in that year, before ending at $963.9 million in 2032 — the form’s Schedule A stops at 2031 and $21.66 billion total.

TSMC’s proposed Texas project: spending and hiring by year

Year

Buildings

Machinery and equipment

New hires

2027

$729.0 million

—

0

2028

$2.59 billion

—

757

2029

$5.28 billion

$649.2 million

1,110

2030

—

$9.05 billion

232

2031

—

$3.36 billion

0

2032

—

$963.9 million

0

Total

$8.60 billion

$14.02 billion

2,099

The tool spending schedule lines up with a change in how TSMC prints its chips. Lithography, the step in the chipmaking process that uses light to project circuit patterns onto the wafer, requires advanced machines. The most advanced do it with extreme ultraviolet (EUV) light. High-NA EUV tools have a higher numerical aperture, gathering more light to print finer features in one pass. Wei said TSMC intends to use High-NA in 2030, which matches the 2030 peak in Texas tool spending, but that is a company-wide plan, and nothing in the Texas plan gives a delivery schedule or names High-NA tools specifically.

What the plan does spell out is its list of eligible property: fab and central utility plant buildings, cleanroom systems, ultra-pure water and wastewater treatment with water-reclaim systems, bulk and specialty gas as well as automated material handling, and gas-insulated switchgear.

Also named is mask or reticle shop equipment as well as lithography, etch, deposition, implant, chemical mechanical planarization (CMP), diffusion, and clean/wet tools, by type, although the list names no tool vendors, EUV counts, or wafer capacity. The mask shop is highlighted as “co-located within the fab and integral to the manufacturing process.” Masks are patterned plates used by a lithography tool to project their patterns onto each wafer, one per chip layer, and every new design needs its own set. Making them on site suggests the fab is meant to stand on its own. Wei also said TSMC is working with ASML on a 12-inch photomask by 2031, which is the year the Texas site would open.

The plan’s location is in Brazos County, Texas, sited across 86 parcels and almost 3,232 acres of land, which is about five square miles. This compares to TSMC’s Phoenix campus at about 1,078 acres on the county tax roll, with about 902 more purchased in January; this leaves the Texas site at about 1.6 times that total. TSMC would build and manage the site, which sets it apart from Terafab, a fab a TSMC customer is planning one county over: Wei has confirmed talks about using its capacity but said any such fab would have to be run by TSMC.

Outlines of TSMC's proposed 3,232-acre Texas site and its 1,078-acre Arizona campus at the same scale, with a square for the 902 acres bought in January 2026.

(Image credit: Tom's Hardware)

Residents in development areas for fabs and data centers tend to raise two concerns, and both are related to utility usage. The first is power: a local report says Bryan Texas Utilities provides that for the proposed area, but it’s unclear who would serve the fab. For scale, a utility filing in Arizona reportedly puts TSMC’s built-out Phoenix campus at about 1.9 gigawatts, a figure for the whole campus, not a single fab.

The second is water: Wellborn Special Utility District reportedly provides service, while the developer is said to intend to buy its water from a third party instead. As a comparison, a state document on an unnamed company’s $45 billion, two-fab project in Sherman, as reported by the Dallas Business Journal, lists 8 to 10 million gallons a day to start with a peak at 20 to 25 million after buildout, but this isn’t a 1:1. That project is targeting production in Q4 2029.

Economic impacts are a significant part of the deal: the plan projects 2,099 direct jobs by 2030, while the agreement would require only 35, the legal minimum. Pay, on the other hand, comes with a projected average salary nearly double the wage level that would need clearing.

Texas appears willing to work with TSMC on this, with a recommendation for approval signed by Deputy Comptroller Noah Betz this week. The gross tax benefit would build over 14 years, starting four years before the formal incentive period, and would cut the district’s maintenance and operations (M&O) levy on the project nearly in half. Even so, the full $354.1 million is only 1.6% of the $22.6 billion investment. In return, TSMC would have to post a performance bond equal to 10% of the benefit.

The Comptroller believes the incentive is a compelling factor — TSMC would not invest in Texas without it — but the office says it has not audited or verified the company’s projections. TSMC, for its part, calls the limit “determinative.”

The Texas tax deal in numbers

Measure

Figure

Source

Direct jobs TSMC projects

2,099 by 2030

Application

Jobs the agreement would require

35

Comptroller

Average salary TSMC projects

$135,687 in 2028, rising 2% a year

Application

Minimum average wage for the project’s jobs

$73,603

Comptroller

Construction workers, 2027–2029

9,841 a year on average; 18,134 at the 2029 peak

Consultant’s model

Out-of-town visitors

708 a year; average stay 41 days

Consultant’s model

Tax benefit, total

$354.1 million

Comptroller

Tax benefit during construction, 2028–2031

$123.6 million

Comptroller

Tax benefit in the incentive period, 2032–2041

$230.6 million

Comptroller

School M&O tax over 20 years, without the agreement

$759.3 million

Comptroller

School M&O tax over 20 years, with the agreement

$405.2 million

Comptroller

Performance bond

$35.4 million

Comptroller

A potentially far larger incentive is federal: a tax credit worth 35 cents back to every qualifying dollar spent, as long as construction technically begins before the end of the year. “Qualified” means the cost of the fab’s depreciable physical property that is integral to running the fab, meaning the buildings and the tools, in the year each goes into service, and “construction” means actual physical work of a significant nature or paying or incurring at least 5% of the qualifying property’s cost, with work continuing afterward. Construction here is projected to start in 2027, after that cutoff, though off-site work under a binding written contract or early spending this year could still count, and an extension has been proposed in the Senate.

The land doesn’t count in this equation, and neither does office space. This is also a credit off the tax bill, dollar for dollar, not a deduction. The rate was 25% under the 2022 CHIPS Act and rose to 35% for property placed in service after 2025. If the full $22.6 billion qualified, that would be about $7.9 billion back, but not every dollar qualifies.

If Texas doesn’t work out, TSMC is also considering “a new land parcel in Arizona,” which would be closer to the existing North Phoenix site. TSMC says that may make many things easier, such as handling a workforce and the logistics, with the ability to use existing suppliers and relationships on known infrastructure. This is an incentive for the state of Texas to give the tax break.

The tax agreement needs approval from both the College Station ISD board and the governor. The district also owns one of the parcels on TSMC’s list for the site: almost 91 acres, with a 24,496-square-foot building from 2024. The board has set a public hearing for Dec. 10, with public comment, and could approve the project’s reinvestment zone that day.

The district has 30 days from the day it receives the application, which puts its deadline in late December. As for Brazos County, town halls could reportedly begin as early as the first week of December, though the county has promised only one, “in the near future.”

Assuming things move forward, the real measure begins with the first phase on land. Even if production arrives a generation late, it would be a positive development for U.S.-based chipmaking.

  •  

The state of China's memory industry in 2026

China’s homegrown memory comes largely from two companies, CXMT for DRAM and YMTC for 3D NAND, and both are booming. CXMT’s Oct. 30 quarterly report shows a nine-month net profit of ¥132.0 billion ($19.6 billion), against a ¥5.28 billion ($785 million) loss a year earlier, on revenue more than eight times as high, at ¥269.0 billion ($40.0 billion). YMTC’s numbers, just for Q1, are at ¥47.04 billion ($7.0 billion) in revenue and ¥33.38 billion ($5.0 billion) in profit attributable to shareholders, more than double 2025.

Both are expanding and adding fabs, and each is edging into the other’s products. No Chinese manufacturer can yet produce high-bandwidth memory (HBM) in volume, though. HBM is the stacked DRAM that AI accelerators depend on, and currently the U.S. bars Samsung, SK hynix, and Micron from selling it into China. CXMT’s prospectus lists no HBM project, though its HBM3E is reportedly in risk production, an early run before the process is fully qualified. Huawei designs its own HBM but doesn’t say who makes it.

Memory is a commodity, so the story is in the wafers. We cover the companies running memory fabs in China: CXMT, YMTC, a handful of smaller Chinese fabs, and Samsung and SK hynix, which run some of their biggest plants there. Huawei makes the cut for its HBM program, though it has no memory fab. Fabless designers, module makers, and NOR flash producers are left out, except XMC for its HBM line. Fab counts, products, and financials come from filings and company statements; capacities, planned fabs, and the HBM progress that remains the big question mark rest largely on anonymous reporting. Let's dive into the current state of the Chinese DRAM industry.

CXMT: three DRAM fabs running, three more on the way

CXMT's LPDDR6 memory package, front and back, below a promotional render of the chip.

(Image credit: CXMT)

CXMT, short for ChangXin Memory Technologies, is China’s biggest homegrown DRAM maker. It operates two 12-inch fabs in Hefei and one in Beijing, each able to produce around 100,000 wafers a month. It is also building fabs in Shanghai and Hefei and is in funding talks for a second Beijing fab, which together could take it past 600,000 wafers a month. The Shanghai fab is expected to have two to three times the capacity of the Hefei base, with tools going in during the second half of 2026 and volume in 2027.

CXMT is now the fourth-largest DRAM maker worldwide, with 9.5% of DRAM revenue in Q2, according to TrendForce. CXMT says LPDDR6 is in mass production for Xiaomi, and its president says the first 4F² product, a server DDR5 RDIMM, is due by year-end. This comes after record first-half revenue of ¥150.3 billion ($22.4 billion), net profit of ¥77.6 billion ($11.5 billion), an 84.84% gross margin on its main business, and a listing on Shanghai’s STAR Market on July 27. Third-quarter profit alone was ¥54.4 billion ($8.1 billion).

The primary products are DDR5 rated up to 8,000 MT/s with 24Gb dies, and LPDDR5X rated up to 10,667 MT/s. CXMT says its fifth-generation G5 platform reaches 11.95nm active-area half-pitch with quadruple patterning for 24Gb LPDDR5X, and gets at least 50% more dies out of each wafer than G4, counted as 8Gb dies. CXMT says a DRAM product on its sixth-generation platform has also completed engineering-sample validation. Jeongdong Choe, Senior Technology Fellow at TechInsights, told Tom’s Hardware Premium that the firm measured the smallest active half-pitch on CXMT’s G4 at 14.8nm and hasn’t analyzed G5 yet.

CXMT lists no GDDR or 3D NAND among its products and is limited to nodes made without extreme ultraviolet (EUV) lithography as it lacks the tooling. CXMT’s second Beijing fab, however, is planned to include a 3D NAND R&D line, which could shake things up. The growth picture for now is capacity and price, with the tests of scaling without EUV lying with the RDIMM and Shanghai fab.

YMTC: going all out on NAND, DRAM in testing

Render of YMTC's Xtacking architecture, with a CMOS logic wafer bonded onto the 3D NAND memory-cell array.

(Image credit: YMTC)

YMTC, short for Yangtze Memory Technologies Co., has two fabs of its own in Wuhan, which can produce about 200,000 wafers a month together. A third fab in the Xinzhou district, registered in September last year, is expected to produce about 50,000 wafers a month by 2027 and eventually 100,000 at full capacity. While YMTC is known for its NAND flash, roughly half of Fab 3’s output is earmarked for DRAM. The company also makes enterprise SSDs and UFS and eMMC parts, and sells consumer SSDs under its ZhiTai brand. YMTC filed its own STAR Market prospectus, to match CXMT’s, on Aug. 21.

NAND flash was, until recently, the star of the show for Chinese memory, and YMTC’s Xtacking technology is one reason why. Its fifth-generation Xtacking 4.0 die, used in 1Tb TLC and 2Tb QLC parts, has 294 gates, and Choe told us 267 of them are active word lines. Most of what YMTC ships, however, is still 160- and 232-layer NAND. Samsung licensed YMTC’s Xtacking bonding patents in February 2025, so the technology could be considered both proven and valuable.

Omdia data put YMTC at 38.5% of China’s NAND market in Q2, ahead of Samsung’s 33.5%. Globally, YMTC ranked third in NAND shipments in Q2, according to Counterpoint Research, and its share of NAND revenue rose from 9% to 14% between Q1 2025 and Q1 2026. YMTC’s stated long-term targets are about 20% of global NAND supply and about 500,000 wafers a month, DRAM included.

For DRAM, YMTC’s Fab 2 is running about 5,000 wafers a month of 16Gb LPDDR5, still in R&D and testing, with no plan for mass production. However, a 9,600 MT/s part on a vertical channel transistor (VCT) 4F² cell is slated for mass production at Fab 3 if it passes qualification. XMC, YMTC’s former foundry unit, left its control in July.

The smaller fabs: Jinhua’s DDR4 and SwaySure’s unfinished line

Two smaller fabs worthy of note are Fujian Jinhua and SwaySure. The former has a 12-inch fab in Jinjiang, which produces custom DDR4 on 25nm, at 40,000–50,000 wafers a month, with about 90% going to Huawei. DDR4 prices have surged this year, by as much as 50% in the first quarter alone, as the big suppliers wind DDR4 down in favor of server and HBM parts and enterprise buyers stock up.

SwaySure, a Shenzhen company founded in March 2022 with state-owned investment, is building a 28nm 12-inch DRAM line and is reportedly backed by Huawei. Analyst Jim Handy of Objective Analysis doubts the 28nm line could make HBM. Neither company responded to our requests for additional information.

China’s memory fabs: what each makes, and what it doesn’t

Company

Fab (location)

Makes

Notably doesn’t make

Status

CXMT

Hefei Phase 1 and Phase 2 (Anhui); Beijing (Yizhuang)

DRAM

GDDR, 3D NAND, HBM in volume

Producing; about 100,000 wafers a month each

CXMT

Shanghai DRAM fab

DRAM for servers, PCs, and cars, plus HBM lines

—

Under construction; volume in 2027

CXMT

Shanghai HBM packaging plant

HBM stacking and packaging

—

Under construction; due by the end of 2026

CXMT

New Hefei fab; second Beijing fab

DRAM; NAND R&D line planned for Beijing

—

Hefei under construction; Beijing in funding talks

YMTC

Wuhan Fab 1 and Fab 2 (Hubei)

3D NAND, TLC and QLC, on Xtacking

DRAM in volume, HBM

Producing; about 200,000 wafers a month combined

YMTC

Wuhan Fab 3

3D NAND; DRAM planned (9,600 MT/s LPDDR5 on a VCT 4F² cell)

—

Equipping; starts late 2026 or 2027; about 50,000 wafers a month by 2027

YMTC

Two more fabs, sites not reported

3D NAND and some DRAM

—

Planned; 100,000 wafers a month each

XMC

Wuhan, two 12-inch fabs and a reported HBM line

Specialty foundry: NOR flash, MCUs, 3D integration

HBM (a 3,000-wafer-a-month line under construction since February 2024)

Operating; out of YMTC’s control since July 2026

Fujian Jinhua (JHICC)

Jinjiang (Fujian)

Custom DDR4 on 25nm

DDR5; HBM unproven

Producing; 40,000 to 50,000 wafers a month

SwaySure

Shenzhen (Guangdong)

DRAM on a 28nm line, planned

—

Under construction

HBM: who’s chasing, and who isn’t

A speaker at Huawei Connect 2026 in front of a slide for the liquid-cooled Atlas 960E SuperPoD, an Ascend 960 cluster marked for Q3 2027.

(Image credit: Huawei)

Not every AI chip needs HBM. Inference hardware can get by on LPDDR5X, as Axera’s AX8860P does in Sipeed’s MaixStation, or on DRAM bonded straight onto the processor, the approach PieceMakers is betting on. Training-class accelerators like Huawei’s Ascend series still need HBM, though, and since the U.S. banned the export of HBM as of Dec. 2, 2024, China can’t buy it from the big three memory makers.

Even those who can get HBM are seeing heat and yield issues with larger memory stacks, specifically 12-high. SK hynix said on its Q3 2026 earnings call that some customers’ spec changes show “demand is indeed overwhelming supply,” and that lowering the stack is “a strategy to increase the number of cubes that can be obtained for the same capacity.” This mirrors other indicators, including potential Nvidia Rubin Ultra decisions, and it suggests that HBM is in short enough supply that even easier-to-build stacks are in high demand.

CXMT has sampled HBM with Tongfu, and HBM3 built on its 16nm-class G4 node to Huawei. Its HBM3E has now gone to several domestic AI chip designers as samples, with limited production due by the end of 2026, and an expansion expected in 2027. Yields are only about 20% to 30%, though, against about 70% at SK hynix, and in testing the chips performed closer to SK hynix’s HBM3 than to its HBM3E. An HBM packaging plant in Shanghai worth at least ¥17.1 billion ($2.5 billion) is targeted for year-end, with capacity for about 30,000 units a month.

Tongfu reportedly sampled HBM2, but its own filings mention only DRAM and flash packaging. Huawei said last year that “we will offer two proprietary HBMs.” It launched the Atlas 350 card in March, built on the Ascend 950PR, which carries 112GB of HBM. XMC has had a 3,000-wafer-a-month HBM line under construction since early 2024, but no production has been confirmed. At this time, YMTC, Jinhua, and SwaySure don’t appear to make HBM, though reports say YMTC is developing the through-silicon via (TSV) stacking it would need, and Jinhua was named in a Huawei-led HBM group in 2024.

Huawei said in 2025 that the 950PR would use HiBL 1.0, its own “low-cost HBM”; TechInsights told us it hasn’t analyzed HiBL 1.0 yet. However, Huawei’s 2025 roadmap specced out the 950PR's 128GB of HBM at 1.6TB/s. Huawei said that its 950PR is “optimized for the prefill stage of inference,” which is compute-heavy with “lower demand for memory access bandwidth,” and that using HiBL 1.0 is “more cost-effective than HBM3E and HBM4E” for that workload. The higher-end HiZQ 2.0, for the 950DT, is due in Q4 and, by Huawei’s figures, brings 144GB at 4TB/s. In both cases, Huawei’s supplier remains in doubt, and the company did not respond to our requests for comment.

Who is chasing HBM in China

Company

HBM effort

Stage

CXMT

HBM3 and HBM3E DRAM

HBM3 samples to Huawei; HBM3E sampling, with limited production by year-end at 20–30% yields

CXMT

Shanghai HBM packaging plant

Under construction; due by the end of 2026

Huawei

HiBL 1.0, in the Ascend 950PR

Shipping since March 2026 in the Atlas 350 (112GB); maker not disclosed

Huawei

HiZQ 2.0, in the Ascend 950DT (144GB at 4TB/s)

Due in Q4 2026; maker not disclosed

XMC

HBM packaging line, 3,000 wafers a month

Under construction since February 2024; production not confirmed

Tongfu Microelectronics

HBM packaging

HBM samples with CXMT and HBM2 samples reported; filings show only DRAM and flash packaging

YMTC

None in production

TSV stacking in development

Fujian Jinhua

Named in a Huawei-led HBM group in 2024

Unproven

SwaySure

None known

Doubtful on a 28nm line (analyst Jim Handy)

Samsung, SK hynix, Micron

Can’t sell HBM into China

Barred by the U.S. rule of Dec. 2, 2024

The foreign fabs, and the restrictive rules

Of the companies from outside China, Samsung and SK hynix both run large memory fabs on Chinese soil, and both are now upgrading their NAND lines there. Samsung’s Xi’an handles about 40% of the company’s NAND, including 236-layer, or V8, in volume, with X2 converting to 286-layer, or V9, this year, slated to reach 5,000 V9 wafers a month in December and 40,000 by December 2027. A Samsung spokesperson told Tom’s Hardware Premium that the company “has been transitioning its existing manufacturing operations in Xi’an to 9th-generation V-NAND in compliance with U.S. export regulations and in close communication with the U.S. government.”

SK hynix’s Wuxi produces 30–40% of its DRAM and has moved from 1z to 1a, with the EUV layers done in Korea. Dalian turns out about 100,000 wafers a month of 192-layer floating-gate NAND and is moving to 240 layers, the most SK hynix is authorized to make there.

SK hynix, which already sells NAND with up to 321 layers elsewhere, told us it needs a U.S. license every year and declined to give product details or capacities for individual fabs. The company said that it intends for its 321-layer flash to be “over 50% of domestic (Korean) capacity in the fourth quarter,” which puts the Dalian lag into relief.

SK hynix also has “Mod B,” a second fab at its Dalian site that was completed in 2023. The company has reportedly tied a new U.S. NAND fab to Washington, letting it ship more U.S. tools there: Dalian’s 2026 license capped its equipment, no 2027 license had been issued as of mid-October, and its U.S.-based Solidigm unit has applied for an export license to buy more tools for Mod B. SK hynix told Tom’s Hardware that “no capacity expansion is being sought for the Dalian Mod B” and has been installing equipment at its Dalian factory.

Solidigm is now reportedly in talks with the U.S. Commerce Department over a $45 billion chip plant in the U.S., but wants Washington’s approval to ship equipment to upgrade the Dalian plant first, arguing that the upgrade would help finance the new site. However, SK hynix denied an earlier report of such a deal and says no specific plans have been finalized.

As for its Chongqing packaging plant, SK hynix told us it is “exploring various strategic options to enhance our packaging competitiveness,” though nothing is final. Elsewhere in China, Samsung’s Suzhou plant handles assembly and testing, and Micron’s Xi’an site handles packaging and testing.

All of this plays out inside a U.S.-China fight over chips that AI has only sped up. CXMT isn’t currently on the Commerce Department’s Entity List, which bars U.S. suppliers from shipping to listed companies without a license; YMTC, Jinhua, and SwaySure are. Jinhua has been on the list since 2018; SwaySure joined in December 2024 over its Huawei links, and YMTC was added in December 2022.

CXMT is, however, on the Pentagon’s 1260H list of Chinese military companies, which it is suing over. It’s been on the list since January 2025 and stayed on with the June update. For Samsung and SK hynix, the validated end-user status that let both firms ship in U.S. tools was revoked as of Dec. 31, 2025. Annual licenses are now required, and the Commerce Department has said it doesn’t intend to license capacity expansions or technology upgrades. Meanwhile, both companies say upgrades are under way, which sits uneasily with that policy.

China, for its part, has been weighing broader technology export controls and has now proposed adding 40 technologies, reportedly including some memory-chip design technologies, to its Catalogue of Technologies Prohibited and Restricted from Export. The draft, Announcement 48 from China’s Ministry of Commerce and Ministry of Science and Technology, is open for comment until Nov. 15, and anyone exporting a listed technology must register first.

Foreign-owned memory fabs in China

Owner

Fab (location)

Makes

Share of owner’s output

Status

Samsung

Xi’an X1 (Shaanxi)

3D NAND: 236-layer V8; V6 ended

About 40% of Samsung’s NAND (both Xi’an fabs)

Producing

Samsung

Xi’an X2 (Shaanxi)

3D NAND, converting to 286-layer V9

In the Xi’an figure

Converting to V9; 5,000 V9 wafers a month in December 2026, 40,000 by December 2027

SK hynix

Wuxi (Jiangsu)

DRAM, mostly 1a; EUV layers done in Korea

30% to 40% of SK hynix’s DRAM

Producing

SK hynix (Solidigm)

Dalian Fab 1 (Liaoning)

Floating-gate 3D NAND, 192-layer, moving to 240

About 100,000 wafers a month; 30% to 40% of SK hynix’s NAND

Producing; upgrading, authorized up to 240 layers

SK hynix (Solidigm)

Dalian Mod B (Liaoning)

3D NAND, if equipped

Not stated

Built in 2023; SK hynix says no expansion is sought; no 2027 license yet

Currently, China’s homegrown memory hinges on two manufacturers that are, admittedly, booming at the moment, although the memory industry worldwide has seen a massive surge since spring 2025. SK hynix said that “our DRAM and HBM volume for the next three years through 2029 are effectively sold out” with supply failing to keep up with demand as “a constraint projected to continue through 2030.” Its average selling prices rose from Q2 by mid-20% for NAND and high-20% for DRAM.

There may be some signs of at least temporary cooling in China’s consumer channel, though, as China Flash Market reports that SSD prices fell across the board this week, with most spot NAND wafers trading more than 30% below suppliers’ official prices. It looks like supply will remain a hot topic and China’s production capabilities are front and center.

CXMT and Huawei both have HBM milestones due by year-end: CXMT’s limited HBM3E production and Shanghai packaging plant, and Huawei’s 950DT with HiZQ 2.0. YMTC’s Fab 3 is due in late 2026 or 2027, and CXMT’s HBM3E expansion is expected in 2027. That leaves little time to ramp within 2027, especially at CXMT’s current yields, so we’re skeptical of volume HBM from a Chinese fab, whether measured against domestic demand or global supply, before 2028. Samsung and SK hynix, meanwhile, still need U.S. licenses for next year to keep tooling their Chinese fabs.

  •  
  •  

Japan puts chipmaking labs inside trucks with mobileFab

Multiple nations worldwide have chip-making programs in their respective universities, a discipline that is seeing increasing demand by the day. Japan is one such nation, and it currently has a program in which students can design circuits to wire chip wafers with miniaturized lithography stations. That gear is now going on wheels to schools and companies thanks to mobileFab trucks.

Each truck-mounted mobileFab container contains three machines: a photoresist coater, a maskless lithography machine, and a photoresist developer. Students take pre-etched wafers made by Japan's NIAIST (Institute for Advanced Industrial Science and Technology) and go through the necessary steps to wire the transistors therein together and produce a finalized chip core. The procedures are analogous to getting a breadboard with some pre-mounted, unconnected components and turning that into a product.

Minimal Fab machines

(Image credit: Minimal Fab Promotion Organization)

The three machines going into trucks are part of the larger Minimal Fab laboratories in place in some Japanese colleges. They're going on the move so that other schools and companies can train students/employees in the art of chipmaking. For now, the 12.5-mm wafers come from the NIAIST, but they can come from other foundries. Each machine is roughly 30 cm wide, and the machines use localized cleaning and sealed between-machine transportation so as not to have to rely on large-scale cleanrooms.

According to the press release by the Minimal Fab Promotion Organization, this system is not only meant for democratizing access to chip manufacturing education. The machines also allow for rapid prototyping and iteration of chip designs, and facilitate small-scale manufacturing — all with modest capital investment.

The "why" of this initiative is fairly predictable: the program's organizers predict that semiconductor fab engineers will be in high demand over the next 10 years, and there aren't even enough teachers going around, making systematic education difficult. Additionally, the division of labor in semiconductor fabs means that many engineers don't participate in all stages of the chip-making process, nor do they have opportunities to operate chip-making equipment themselves. The mobileFab will be on display at the SEMICON Japan 2026 conference in December.

  •  

AI agents design an entirely new CPU architecture from scratch, startup claims

Architect Labs, a Palo Alto startup, said in a research blog post that its AI systems discovered, designed, and verified Frostbite, a general-purpose CPU with a new instruction set “built from the ground up.” Across 25 workloads, a four-tile Frostbite cluster delivered 4.59 times the performance per watt of a similarly sized “silicon-proven” dual-issue, in-order CPU core. Those numbers come from a simulated 7nm design that has not yet been made in silicon, and the company says it can’t name the comparison core for legal reasons.

Conventional CPUs have hardware that “rediscovers, at runtime, which instructions actually depend on each other.” Multicore designs also need deep cache hierarchies and coherence protocols, which keep every core’s view of shared memory consistent, but scale poorly and cost area and power. Architect Labs’ alternative is what it calls “multithreading for free,” where the program itself exposes the parallel work, without threads, locks, or out-of-order hardware required for that discovery.

Frostbite’s programs are compiled to interaction nets, a model of computation from 1990 in which a program is a graph of nodes and computation happens by rewriting pairs of connected nodes, and the chip is designed around this distinct paradigm. Pairs of nodes being rewritten never overlap, so they can run in any order, or all at once, and arrive at the same result. Every value is also used exactly once, so data can stay in small local memories instead of large shared caches.

An example of the difference given by the team is a 5x5 chess-like board with five queens, placed so none can attack another. A typical program searches for solutions one board at a time. As an interaction net, the same search breaks into 3,183 small operations, and the longest chain that has to run in order is only 262 steps, so on average about 12 operations are ready to run at once at each step. Nothing about the program was rewritten to get there, as the parallel work was already intrinsic.

Layout of the Frostbite chip, a four-by-four grid of tiles with one two-by-two quad and one L3 node outlined

(Image credit: Architect Labs)

Each of the chip’s tiles, small identical processing units linked by an on-chip network, has its own small local memory. Four tiles, plus four L3 nodes, form the cluster that’s benchmarked against the conventional core for the performance claims, but the full layout has 16 tiles. The design reached 800 MHz in early synthesis but ended up at 500 MHz in the final layout. The cluster also averaged 8.77 times the comparison core’s performance per area, and the table below shows how its performance per watt varies by workload.

How Frostbite’s efficiency gains vary by workload

Workloads

Frostbite performance per watt vs. comparison core

All 25 (geometric mean)

4.59x

10 used to tune the design

6.02x

15 held out until the final evaluation

3.83x

Best: conv2d (held out)

23.12x

Worst: recursive Fibonacci (held out)

1.15x

It may come as some surprise that the AI which built Frostbite started with what the company calls “zero architectural priors,” though the team first picked the workloads it had to do well on, and this sort of blank slatism may have its advantages in avoiding bias. Instead, the agents read papers and benchmarks, built Python models, and then selected one concept for focus. The original 141-page PDF output, which contained a programming model, runtime, and high-level blocks, was deleted after the first register-transfer level (RTL) design was generated, because “many of the numbers and estimates were well off what was physically possible.”

That PDF was only ever a starting point. Once the agents picked an architecture, they moved away from English — as it can’t get every detail right or catch every mistake, according to the team — and wrote the spec in the company’s own language, called ASL. ASL translates to Lean, a proof checker, so it can be machine-checked, which the company says stops a large class of bugs and cuts down on agents gaming their objectives. From this, the agents devised Arcmodel, a software model of the whole chip written in ASL, before any circuit design existed.

Simulating the RTL is slow, so the agents tested ideas on the model instead, which ran about 200 times faster. At first, the model’s power estimates were off by up to almost 250%, but an automated loop adjusted it until it matched the circuit design within just 5%.

From there, swarms of agents proposed changes in parallel, and each one was checked against the spec, tried in the fast model, built into the circuit design, and measured for power before being kept or dropped. This led to 58 ideas tried, with 37 kept. Separately, a behavior emerged that “was never specified by any human,” in what is known as work stealing: a tile with nothing to do can pull spare work from a neighbor or, in lieu of anything to do, go idle to save power.

Where each chip’s energy goes

Share of energy (one four-tile cluster, mean of 20 workloads, excluding clock distribution)

Comparison core

Frostbite

Memory

57%

38%

Fetching, decoding, and issuing instructions

27%

6%

On-chip network and scheduler

Not broken out

26%

Clock distribution (share of total energy, left out of the rows above)

49%

41%

This isn’t Architect Labs’ first design, as it showed off Redwood, an AI inference accelerator for robots and drones, in August. In that case, the company says its AI generated the RTL, verification, firmware, drivers, and kernels in under two weeks from a spec written by two human architects. Redwood still runs only on an FPGA and hasn’t been made in silicon, though the company says it is working toward having it built at TSMC.

Tendrils Compute, a possible rival based in Cambridge, U.K., raised funding earlier this month for a processor it says will have “thousands of cores operating in parallel.” It is also developing Vine, the same language Frostbite’s programs are written in.

Architect Labs says more benchmarks are coming, but they’re only part of the plan. It also wants an FPGA-hosted “software playground for anybody to run a program on Frostbite” along with a “preliminary operating system.” Eventually, it plans to release Frostbite’s RTL and instruction set.

In the meantime, the company plans to cover more workloads and compare “a broader set of CPUs,” including larger Frostbite mesh configurations against multicore versions of the comparison core with large caches. It also plans to test against “larger, wider, out-of-order CPUs,” with these comparisons due in the coming months on popular CPU benchmark suites such as SPEC and PARSEC.

  •  

Rapidus reportedly struggles to produce working SRAM on its 2nm node, putting 2027 mass production at risk

Rapidus is reportedly facing challenges in developing functioning SRAM cells using its 2nm-class node, which relies on EUV lithography. According to a new report, Rapidus has missed a critical milestone to demonstrate working SRAM cells this summer, despite the Japanese company's efforts in producing semiconductor test structures at its fab in Japan in mid-2025. In addition, the company is allegedly fighting contamination in its cleanroom. This puts the plans of the government-backed startup to begin mass production of chips in 2027 at risk.

Rapidus misses SRAM milestone

Bloomberg's report spells bad news for the Japanese firm. Rapidus began to produce test structures with 2nm-class Gate-All-Around (GAA) transistors at its IIM-1 facility in Hokkaido in July 2025, nearly 16 months ago. At the time, the company announced that its prototype transistors exhibited the expected electrical characteristics, which suggested that its equipment and fundamental process steps worked as intended.

"Then we had a testing and July 10th we confirmed a major milestone: we successfully obtained electrical characteristics of 2-nanometer node GAA transistors," said Atsuyoshi Koikem, chief executive of Rapidus, at Hot Chips 2025. "We can see the transistor actually works."

Rapidus

(Image credit: Rapidus)

However, production of individual transistors is considerably easier than fabrication of functional integrated circuits (ICs) with multiple interconnected devices. According to sources at Bloomberg, Rapidus was supposed to demonstrate functional static random-access memory (SRAM) cells by summer 2026, but has yet to achieve this milestone. It is noteworthy that the report does not reveal whether Rapidus is struggling with individual SRAM cells, larger memory arrays, or achieving acceptable electrical characteristics and yields, so we will have to speculate.

SRAM is fundamental to modern processors because it serves as cache memory and forms other on-chip memory structures, which can contain hundreds of millions of bitcells. Furthermore, SRAM arrays are important vehicles for early process evaluation, as their repetitive structures expose manufacturing defects, transistor variability, and other problems that may not become apparent during tests of individual transistors.

A conventional 6T SRAM bitcell consists of six transistors: two cross-coupled inverters (four transistors) and two access transistors. However, these transistors also require contacts and local interconnects, as well as connections to wordlines, bitlines, and power rails (VDD and VSS). Meanwhile, a complete SRAM macro also requires peripheral circuits, such as row decoders, sense amplifiers, write drivers, and control logic, which makes a 256 KB SRAM macro quite a sophisticated IC. As a result, chipmakers usually use both SRAM cell arrays and SRAM macros as primary means to evaluate, monitor, and qualify process technologies at various stages. Furthermore, low defect density of SRAM macros is crucial for good yields of SRAM-intensive chip designs.

The importance of SRAM makes Rapidus' reported difficulties particularly concerning given its intention to begin commercial production in 2027. While the company does not confirm delays in mass production using its 2nm fabrication technology, in an interview with the Japan Times, representatives at Rapidus already said that the company was on track to mass-produce chips in the second half of fiscal 2027, which ends on March 31, 2028. Previously, Rapidus had specified its production targets without specifying calendar years or fiscal years, which by default implied the calendar year.

Time is running out

Before it can mass-produce processors for customers, the company must demonstrate functional SRAM cells, integrate them into larger arrays, achieve acceptable yields, qualify its process technology, and then initiate risk production around a year before the start of high-volume manufacturing (HVM).

Rapidus

(Image credit: Rapidus)

Chipmakers do not generally disclose detailed schedules for SRAM development and milestones as far as new manufacturing technologies are concerned. However, TSMC tends to share progress on its upcoming nodes using the performance and yield of a 256 Mb SRAM array or '256 Mb SRAM yield on an internal product-like vehicle.' For example, TSMC's N2 demonstrated more than 80% of its target device performance and over 50% yield on a 256Mb SRAM test chip in April 2023. By April 2024, the process had advanced to more than 90% of its target device performance and over 80% SRAM yield. About half a year before mass production started, in May 2025, N2 transistor performance was close to 100%, whereas 256 Mb SRAM average yield was over 90%. By contrast, Rapidus has not announced any SRAM progress so far, and Bloomberg reports that the company has failed to produce functioning static random access memory cells, meaning that its SRAM yield is 0%.

While there is no rule of thumb that a company must have a functional SRAM array or macro N quarters before mass production of chips with that array or macro, it is evident that the reported setback leaves Rapidus with limited time to complete its crucial development milestones before kicking off mass production by the end of fiscal 2027.

Exceptional complications

Production of 2nm-class chips with GAA transistors and extreme ultraviolet lithography is exceptionally complicated, even for established chipmakers. So far, only Intel, TSMC, and Samsung have begun mass production of chips using nodes that rely on GAA devices. Unlike FinFETs, GAA transistors feature multiple vertically stacked silicon nanosheets surrounded by gate materials, which improves electrostatic control but introduces additional fabrication challenges. Furthermore, extremely small feature dimensions require exceptional precision in deposition, etching, lithography, and process control. For Rapidus, which was founded only in 2022 and relies on process technology IP developed by IBM, the task of reproducing these processes consistently in a new fab represents an incredibly tall task.

Rapidus

(Image credit: Rapidus)

One potential problem involves selective removal of silicon-germanium (SiGe) layers that separate silicon nanosheets during fabrication. These sacrificial layers must be removed without damage to the silicon channels or significant changes to their dimensions. Insufficient etching can leave unwanted material between nanosheets, whereas excessive etching can reduce channel thickness or increase surface roughness. A research paper published by imec identifies nanosheet release as one of the critical challenges of GAA manufacturing, particularly because variations in channel geometry can affect transistor performance and consistency.

In fact, EUV lithography itself introduces additional complications. At extremely small dimensions, stochastic effects associated with photon absorption, resist chemistry, and subsequent pattern transfer can produce variations in feature dimensions, edge roughness, and occasional missing or malformed structures. Such defects can affect pretty much everything, including transistor gates, contacts, and interconnects. In fact, there is a company called Fractilia that specializes solely in stochastic controls. Although individual test transistors may function correctly, circuits with millions of interconnected devices are much more vulnerable to failures caused by stochastic defects.

Another potential challenge concerns inner spacer formation. These extremely small dielectric structures electrically isolate the gate from the source and drain regions. Their fabrication requires precise lateral etching of SiGe followed by dielectric deposition. Variations in spacer geometry can affect effective gate length, parasitic capacitance, leakage current, and transistor performance. A paper published in Nanomaterials in January 2026 demonstrates that even subtle differences in etching conditions can affect spacer geometry and nanosheet integrity, which potentially introduces electrical variability that becomes particularly problematic in SRAM circuits.

Gate stack integration presents another possible source of difficulties. GAA fabrication requires conformal deposition of gate dielectrics and metal materials around multiple nanosheets, including narrow spaces between them. Variations in material thickness, interfaces, and effective metal work function can alter transistor threshold voltages, which is not a big problem for individual transistors or tiny test patterns. However, for SRAM structures, excessive differences between nominally identical transistors can reduce read, write, and retention margins, which could prevent cells from operating reliably at their intended voltages and greatly narrow the manufacturing process window.

Finally, contact resistance, interconnect defects, and particle contamination can further complicate circuit integration. Bloomberg specifically reports that Rapidus is working to improve dust and particle control in its cleanroom. Normally, there might be no connection between contamination and the SRAM woes the company is experiencing. However, one of the distinct features of IIM-1 is that it uses an unconventional grid-based wafer transportation system to enable its single-batch processing as well as increase the efficiency of expedited processing. Usage of this system raises questions about whether the new infrastructure has undergone sufficient contamination and reliability qualification, though, again, a transportation system alone could not be responsible for zero (or near-zero) SRAM yield.

On-track for 2027?

Rapidus reportedly stresses that it remains committed to mass production in the second half of fiscal 2027. However, until the company demonstrates functional SRAM and subsequently larger integrated circuits, questions about its ability to manufacture commercially viable 2nm chips will persist.

  •  

Visa und Mastercard: Daten tausender Kunden tauchen im Netz auf

Datenschutz, Hacker, Hack, Technologie, Kriminalität, Verschlüsselung, Datendiebstahl, Hacking, Ransomware, Digitalisierung, Cybersicherheit, IT-Sicherheit, Datenleck, Netzwerksicherheit, Firewall, Binärcode, Informationssicherheit, Digitale Sicherheit, Cyberbedrohung Tausende Kunden von Visa, Mastercard und JPMorgan Chase finden ihre Daten aktuell offen im Netz wieder. Eine bislang wenig bekannte Ransomware-Gruppe namens "n0n" hat diese erbeutet und nun teilweise öffentlich gemacht. (Weiter lesen)
  •  

FaceStealer: Nordkorea-Hacker locken auch erfahrene Nutzer in die Falle

Hacker, Geheimdienst, Hackerangriff, Flagge, Fahne, Nordkorea, Geheimdienste, Nachrichtendienst, Top Secret, Agency, Roter Stern Angreifer mit Verbindungen zum nordkoreanischen Staat haben eine perfide Masche entwickelt, um Kryptowährungen zu erbeuten. Im Rahmen der vom FBI als FaceStealer benannten Kampagne ist ein Schaden von mindestens 400 Millionen Dollar entstanden. (Weiter lesen)
  •  

PureVPN für Torrent-Downloads: Günstig, doch wo ist der Haken? (Werbung)

PureVPN für Torrent-Downloads: preiswerte Abos und viele VPN-Server in aller Herren Länder. Doch wie gut ist der Schutz der Kunden?

Der Artikel PureVPN für Torrent-Downloads: Günstig, doch wo ist der Haken? (Werbung) erschien zuerst auf TARNKAPPE.INFO

  •  

Amazon bringt Sicherheits-Drohne mit Kamera für den Indoor-Betrieb

Kamera, Drohne, Amazon Ring, Ring Drone Cam Der zum Amazon-Konzern gehörende Anbieter von Heimsicherheitsprodukten erweitert sein Sortiment ab sofort über Kameras, Klingeln und Ähnliches hinaus. Ab sofort entwickelt und vertreibt Ring auch Roboter und Drohnen. (Weiter lesen)
  •  

3D-Druck: Tripo 3D bietet viele Vorlagen - auch für Weihnachten

Künstliche Intelligenz, Test, Timm Mohn, 3D-Drucker, 3D-Druck, 3D-Modelle, Prompt Engineering, 3D-Modellierung, Tripo 3D, Bambu Slicer, Modellbibliothek Tripo 3D ist ein KI-gestützter Dienst, um 3D-Modelle aus Text- oder Bildvorlagen zu erstellen. Bei der Verwendung fällt positiv auf, wie unkompliziert sich die auf der Plattform verfügbaren Modelle verwenden lassen. Mit wenigen Klicks wird das gewünschte Design ausgewählt und als 3D-Datei exportiert. Anschließend lässt es sich beispielsweise im Bambu-Slicer öffnen, bei Bedarf in der Größe anpassen und für den Druck vorbereiten. Viele der Modelle sind bereits ohne größere Anpassungen druckbar. (Weiter lesen)
  •  

Zabbix 8.0 LTS bringt OpenTelemetry und KI-Anbindung

Mit Zabbix 8.0 LTS ist eine neue Langzeitversion der Open-Source-Monitoringplattform erschienen. Zu den wichtigsten Neuerungen zählt die native Unterstützung von Application Performance Monitoring (APM) auf Basis von OpenTelemetry. Damit lassen sich neben klassischen Infrastrukturwerten auch Anwendungs-Traces, Metriken und Protokolldaten erfassen und auswerten. Die Telemetriedaten gelangen über Zabbix-Proxies per OTLP/gRPC in das System. Ein eigener APM-Bereich […]

Der Beitrag Zabbix 8.0 LTS bringt OpenTelemetry und KI-Anbindung erschien zuerst auf fosstopia.

  •